Project Scenario – Module 3..................................................... 3-4

 

Hardware Ninja Project Standards............................................... 5

 

Feasibility Study........................................................................ 6-9

 

        Profit & Loss Statement..................................................... 10

 

Work Breakdown Structure (WBS) Outline................................. 11

 

        Project Manager ..................................................... Vlad Tab

                Operations new site plan

                OSS new site plan

                Old OSS site plan

 

        Layout.................................................................... Zoran Tab

               

        Hardware – Identify existing.................................... Pam Tab

                Scope of existing hardware

                Move existing hardware

 

        New Equipment................................................. Dong-uh Tab

               

        Deploy.................................................................... Pavel Tab

 


 

Introduction:   Module Three

 

Fly By Night Inc. is growing rapidly.  Because of this growth, two departments - the Operations department and your department, Operations Systems & Support (herein “OSS”), have both outgrown their spaces.

 

The CEO, Maryanna VanDhyke, has given her approval to authorize the Operations department to move to the 5th floor of the building which was recently vacated by another company.  She has also authorized OSS to move into Operations old space which is double the size OSS has now.  The old OSS space will, of course, be used for storage of old office equipment.  Because both departments report to the CEO, she has charged OSS with complete responsibility for the move.  She wants the move to happen simultaneously so that no other groups grab the vacant space.

 

OSS has been notified that the move will begin in 6 weeks and, because of your expertise in moving computer equipment, that OSS is in charge of planning and executing the move and responsible for successfully completing this move without snags by the deadline.  Here are the requirements:

 

v  Get the new floor ready to accept 35 workstations and 3 printers

v  All workstations’ PCs and printers must be on the network

v  Operations has 30 PCs and needs 5 new PCs are to be purchased and set-up by the deadline

v  All 30 existing PCs need to be upgraded from Windows ME to Windows XP and the 5 new PCs must also use Windows XP

v  All 35 PCs will need to have their Internet Explorer service packs upgraded.

v  All 35 PCs will now need to have Microsoft Project loaded since everyone now wants to do project management (except for this move!).

 

v  Operations has 5 new people starting on Tuesday after the move.

v  OSS has hired 4 new people to start on Tuesday after the move.

v  OSS may order the new PCs,

v  The 3 printers are all different (1 color laser jet, 1 b&w daisy wheel, 1 linefeed printer)

v  OSS has 4 existing workstations with PCs and will buy 4 more PCs so that 4 more workstations will be added to OSS.  OSS has 2 printers.

 

v  The move is to take place at the end of week 6 starting on a Friday.  It is also a 3-day weekend, so the CIO wants OSS to complete the move for everyone in 4 days!  On Friday, the Operations staff will pack the stuff in their drawers into boxes and move them to the location indicated for them.  The PIB will do a walk-through with the CEO at 8 a.m. on Tuesday morning to show him how successfully “he planned and executed his plan” for this move.

v  OSS has complete power to:

o   Contact and oversee facilities  to:

§  Get the new Operations space ready (but the specifications/ floor plan must come from OSS in agreement with Operations management).

§  Get the new OSS space ready (providing the specifications/ floor plan).

§  Perform the moving tasks (desks and cabinets) for both Operations and OSS, but each group must be supervised by an OSS person.  However, moving PCs and Printers to the correct user’s location and hooking them up must be done by OSS.

§  Perform the phone line change-overs.  By the way, everyone wants to keep their same phone extension.

v  Hmmm, who’s going to order those new workstations for the new Operations and new OSS people?

v  Hmmm, will all the new people in Operations and OSS have phones to use on Tuesday?

v  Because OSS is a group of planners and doers, everything will be documented so that absolutely nothing goes wrong with this move.  They are so extraordinary that they even have a contingency plan for some of the things that could possibly go wrong.


 

 

HARDWARE NINJAS PROJECT STANDARDS

All documents will be created in Word 2010, Visio 2010, and Excel 2010 in company approved format with the company logo and the watermark.

 

 

OSS Team functions

 

 

 

 

Any changes to the documentation must be approved by the Project Manager Pavel Panteleyev and the documents version table updated accordingly. OSS will meet every Monday and Wednesday until project is complete.

 

 

 


 

FEASIBILITY REPORT

 

Department:                                      Operations Systems & Support                      

 

Product or Process:                         Install 35 workstations and 3 printers on 5th floor              

                                                                                Install 9 workstations in old Operations area

                                                            Create storage area in old OSS area

Document Owner:                                     Operations & Systems Support Staff

Project or Organization Role:         Developer / Technician          

 

Version

Date

Author

Change Description

1

07/18/11

Pamela Bolton

Created Document

2

07/25/11

Pamela Bolton

Revisions

3

08/01/11

Pamela Bolton

Final Revision

Project Feasibility Report Audit Log

 

Record Name

Responsibility

Approval Authority

Distribution

Version 1

Pamela Bolton

Vladimir Vasilenko

OSS

Version 2

Pamela Bolton

Vladimir Vasilenko

OSS

Version 3

Pamela Bolton

Vladimir Vasilenko

OSS

​Project Feasibility Report Purpose

A Project Feasibility Report is a controlling document that incorporates the goals, strategies, and methods for performing a project. The Project Feasibility Report describes all aspects of the risk identification, estimation, evaluation, and control processes. The purpose of developing such a plan is to determine the approach for cost-effectively performing the project.

Stakeholder Roles and Responsibilities

Role

Project Feasibility Responsibilities

Assignment

Project Manager

The Project Manager is responsible for the Project Feasibility Report being implemented and for reporting to the CEO of Fly By Night Inc.

Vladimir Vasilenko

Moving supervisors

Is responsible for insuring move feasibility and organizing labor.

Pamela Bolton

 

Project Feasibility Report Process and Activities

Risk Management Activity

Risk Management Task Description

Ownership (Participants)

Ordering

Will order all materials and equipment needed to perform the move in a safe and effective manor

Dong-Uh Choi

Moving & Installation

Reports to Moving Supervisor for all necessary details. Carries out all roles assigned by Moving Supervisor in a quick, efficient, and safe manner.

Pamela Bolton

Zoran Knezevic

Pavel Panteleyev

Dong-Uh Choi

 Analyst

Responsibilities include proper material requisitions to include hardware and cable requirements.

Dong-Uh Choi

Wire Schematic/Office Floor Plan

Detailed plot of office layout for wires, furniture and personnel

Zoran Knezevic

Installing Cables

Will install all necessary cables as deemed necessary by the Wire Schematic/Office Floor Plan

Facilities

Hardware Installation

Will ensure all hardware components are installed as per the Wire Schematic/Office Floor Plans. This includes all workstations, telephones, and printers

Zoran Knezevic

Pavel Panteleyev

 

Network Connections

Will ensure all hardware is properly hooked up to the company network and all connections are in proper working order

Zoran Knezevic

Pavel Panteleyev

 

 Risk Assessment and Management Table

Risk Type

Description of Risk & Steps to Minimize Risk

 

Risk

Chance

 

Risk

Impact

 

Risk

Priority

 

Risk Owner

Personnel Injuries

Injury to team members due to negligence or improper training

Pamela will hold a short training class with team members to instruct on proper lifting and moving techniques

Medium

High

High

Vladimir Vasilenko

Damage to Equipment

Unnecessary and unforeseen damage to equipment could cause more monetary loss than estimated

Proper lifting and moving techniques in training class

Low

Low

Low

Vladimir Vasilenko

Network Vulnerability

Company network open during installation of new computers

All contractors will be escorted while in working area

Low

High

Medium

Vladimir Vasilenko

 

 

 

 

 

Economic Feasibility (see Profit & Loss Statement page 10)

 

Moving equipment

·         Operations to 5th floor

·         OSS to old Operations location

·         Create storage area

New furniture & equipment

See RFP, Dong-uh Choi

Other

·         Welcome balloons

·         Food

Training needs

·         Outsourcing Windows XP

·         In-house training as indicated

Schedule Feasibility

Activity

Completion Date / Process

Ownership (Participants)

Wire Schematic/Office Floor Plan

July 18

Schematic will be done and approved so ordering can be completed by July 20

Zoran Knezevic

Pavel Panteleyev

Ordering

July 20

All necessary components and parts will be ordered by this date so we can ensure everything is present at the time of install

Dong-Uh Choi

 

Installing Cables

September 2

All cables (power, Ethernet, telephone, coax) will be installed by this date so as to not hamper the move in schedule

Facilities

Pamela Bolton coordinator

Moving & Installation

 

 

Commence on September 3, completed no later than September 5.

Rooms and equipment will be ready for move on this date. All equipment will be moved and installed. All scheduled events will be completed and running by the end of business on September 5.

Pamela Bolton - Supervisor

School Team - Moving

Coworkers - Moving

Zoran Knezevic - Installation

Pavel Panteleyev - Installation

Walk-through

September 6, 8am – Operations

 

September 6, 10am – OSS site

CEO, Maryanna Vanhdyke

Project Manager

 

 Risk Management Plan Approvals

Prepared by:              

Zoran Knezevic

For Project Manager, Vlad Vasilenko

Approved by:             

Maryanna VanDhyke

Project Sponsor

 

Maryanna VanDhyke CEO

Executive Sponsor


 

Profit and Loss Statement

FLY-BY-NIGHT, INC.

For the January 1, 2010 ending December 31, 2010

 

 

Total Income

 

28,987,000,000

Operating Expenses

Sales and Marketing Expenses 

 

2,000,000,000

General and Adminstrative

Wages and salaries

 

8,000,000,000

Computer Hardware

 

2,000,000

Office equipment

 

1,000,000

Administrative (Rent, telephone, utilities, insurance

 

10,000,000

Training (outsource)

 

5,000,000

Total General and Adminstrative Expenses

 

8,018,000,000

Total Operating Expenses

 

18,036,000,000

Net Profit 

 

10,951,000,000

 


 

 

Work Breakdown Structure Outline

 

 

Role

 

Tasks

 

July 24 to September 5 (3,4,5)

 

 

Comments

Project manager

Vlad

Facility/Maintenance

 

New Staff Requirements

 

 

 

Zoran

Layout

 

 

 

Pam/Zoran

 

Hardware – Identify existing

 

 

 

 

Pam/Dong-uh

Move existing hardware, desks, cabinets

 

 

 

Dong-uh

Order new equipment/RFP

 

 

 

Pavel

Deploy upgrades